Project Gallery
Interior Work — Start to Finish
Interior Stairwell — Protective Coating System
In ProgressSpray-Applied CoatingSurfaces prepared, masked and contained, then spray-applied for uniform coverage across walls and landings.
Completed
Finished StairwellClean lines at every transition and full coverage on treads, risers, walls and rails.
Corridor Renovation — Containment to Completion
BeforeMasked & ContainedBase, frames and trim taped out and the doorway sealed so the work area stays isolated from occupied space.
AfterCompleted CorridorWalls, base and frames finished to a uniform sheen and handed back clean, bright and ready for occupancy.
Floor Coating System — Preparation to Finish
BeforeSurface PreparationExisting floor cleaned and profiled, edges cut in by hand and the first section laid to confirm adhesion and color.
AfterCoating CompleteRolled out to an even, uninterrupted finish with crisp lines held tight at the base and door openings.
Elevator Lobby & Corridor — Protected and Repainted
In ProgressSurfaces ProtectedDrop cloths down, hardware and call stations masked, and the finish coat cut in tight to a freshly painted base.
CompletedFinished CorridorDoors, frames and base returned to a clean, consistent finish along the full run of the corridor.
How We Deliver — From Prep to Final Product
Step 1 · PrepPrep & RepairFailed plaster and peeling coatings cut out, rebuilt and sanded back to a sound, paint-ready substrate.
Step 2 · MaskingMasked & ProtectedFixtures, tile and trim papered and taped so only the surfaces being coated are ever exposed.
Step 3 · PaintingCoating AppliedSpray-applied in controlled passes — full respirator and glove protection — for an even, factory-smooth finish.
Step 4 · Final ProductHanded Back ReadyWalls, ceilings and trim rebuilt, coated and cut in clean — every unit handed back ready for use.
QA / QC
Quality AssuranceQuality AssuranceEvery project is managed from the QWP office — submittals, certificates of insurance, schedules and daily reports tracked from bid to closeout.
Quality ControlQuality ControlEvery area is walked and signed off with the client’s representative before turnover.
Commercial, industrial and institutional interiors — surface preparation, spackling, plaster repair and protective coating systems.
Our Crew
The People Behind the Work
One Crew, One Standard
Every Quality Wet Paint project is staffed by our own trained painters and finishers — the same faces from mobilization through final punch list. They arrive in full site PPE, work to a written scope, and hand the space back cleaner than they found it.
- Hard hats, high-visibility gear and task-appropriate PPE on every crew member
- Branded Quality Wet Paint apparel and a crew that mobilizes as one team
- Trained in surface preparation, spackle, skim coat and finish application
- Floors, fixtures and adjacent finishes masked and protected before work begins
- Supervised on site by a foreman who reports directly to ownership
Our Crew On Site

Branded on Every SiteOur own painters and finishers, in Quality Wet Paint apparel start to finish.

The Full Crew On SiteMobilized as one team and briefed together before every shift.

The Full RosterOur painters and finishers together in uniform.

Safety Gear, Head to ToeHi-vis and hard hats on every active floor.

The Owners ClubLeadership with our Sherwin-Williams partners.

Kickoff DayOn site with the GC the day a project begins.
Commercial, industrial and institutional interiors — delivered by a crew that shows up prepared.